1、 The HZ-15 concrete drilling and coring machine is mainly used for drilling and coring hardened concrete in buildings, highways, airports, docks, dams, etc. It has the advantages of simple operation, convenient relocation, accurate drilling and coring, smooth surface of core samples, and no accidental damage to core samples. It is an excellent equipment for highway transportation departments, construction departments, and related colleges and universities. This machine complies with the standard GB11818-89 "Technical Requirements for Concrete Drilling and Core Sampling Machines"
In addition, this drilling rig can also drill and core other non-metallic brittle and hard materials, such as refractory materials, ceramics, glass, and rocks2. Technical Parameters
Large drilling diameter: Φ 150mm
Large drilling scale: 400mm
Feed method: manual
Spindle speed: 500-1000r/min
Drill bit form: artificial diamond thin-walled drill bit
Supporting motor: single-phase series motor
Power: 2.2KW-2.5KW
Voltage: 220V
Dimensions: length * width * height 470 × 235 × 880mm
Remarks: Diamond drill bit is separately equipped
¢ 50 ¢ 100 ¢ 150 (with various other specifications of drill bits available)
III. Structural Principle
This machine mainly consists of the following parts (as shown in the figure):
1、 Rack (4): Its columns are equipped with racks, and four adjustment screws (5) are installed on its base
2、 Sliding seat (1): It is mounted on the column, and its internal gears form a gear pair with the rack on the column. By rotating the feed handle, the sliding seat moves up and down along the column
3、 Gearbox (2): fixed on the slide, with a drill bit (3) installed on its main shaft, which moves with the slide to achieve the purpose of drilling
IV. Instructions
1. Move the machine to the location where the core needs to be drilled, screw on four adjustment screws (5) on the base, adjust the machine level, and embed M16 iron expansion bolts on the ground to fix the machine.
2、 Install the drill bit according to the size requirements of the borehole
3、 Connect the water source and check if there is any water leakage from the drill bit
4、 Turn on the power switch, idle for a few minutes, and rotate the feed handle to drill in
V. Precautions
1. When drilling, the feed rate should be kept uniform, about 3-5cm/min. If the drill bit is stuck, the feed rate can be appropriately reduced. If necessary, the drill bit can be lifted a section and then slowly drilled in. Avoid hard drilling to avoid damaging the drill bit and machine.
2、 Adequate water cooling is required throughout the entire drilling process
3、 At the end of drilling, the machine can only be stopped when the drill bit is detached from the workpiece
4、 During the drilling process, overloading is not allowed. When the motor temperature exceeds 70 ℃ (which feels hot), the loading force should be reduced and a new drill bit should be replaced
6. Maintenance and Inspection
1. Regularly check the connections of each component, and adjust them promptly if they are loose.
2、 When installing the drill bit, calcium based grease should be added to the two threads
3、 After drilling, clean all parts of the drilling rig and add lubricating oil to the columns and racks
4、 Change the lubricating grease in the gearbox every six months